Articles

News Articles

Entries for April 2013

02
DTEK Group orders 35 V112-3.0 MW wind turbines for second stage of Botievo wind project

[Read the rest of this article...]

Posted in: Surface Finishing
Actions: E-mail | Permalink |
02
Unit 2 at PacificGas and Electric Company's (PG&E) Diablo Canyon Power Plant isrunning at full power again following a planned maintenance and refueling outage that beganFeb. 3

[Read the rest of this article...]

Posted in: Surface Finishing
Actions: E-mail | Permalink |
02
Wood Group GTS was awarded an$11.2mcontract to re-rate one of Los Angeles Department of Water and Power's (LADWP's) Hitachi hydro turbine generators at the Castaic Power Plant, a pumped storage facility 50 miles north ofLos Angeles

[Read the rest of this article...]

Posted in: Surface Finishing
Actions: E-mail | Permalink |
02
Alstom Power has renewed a maintenance contract with Petrobras for seven years to service 11 gas turbines, four steam turbines and 14 generators installed in their Governador Leonel Brizola (Termorio), Fernando Gasparian (Piratininga) and Celso Furtado (Termobahia) combined-cycle power plants

[Read the rest of this article...]

Posted in: Surface Finishing
Actions: E-mail | Permalink |
02
The U.S. Environmental Protection Agency (EPA) has issued updates to pollution limits for new power plants under the mercury and air toxics standards, based on new information and analysis that became available to the agency after the rule was finalized

[Read the rest of this article...]

Posted in: Surface Finishing
Actions: E-mail | Permalink |
02
Posted in: Industry News
Actions: E-mail | Permalink |
02
Posted in: Industry News
Actions: E-mail | Permalink |
02
Posted in: Industry News
Actions: E-mail | Permalink |
02
IFC, a member of the World Bank Group, has signed an advisory services agreement with eastern Russia’s largest energy supplier to develop renewable energy sources in isolated areas of the country, part of an effort to decrease local dependence on imported fuel and cut greenhouse gas emissions

[Read the rest of this article...]

Posted in: Surface Finishing
Actions: E-mail | Permalink |
01
ABB, the leading power and automation technology group, recently announced that it has been awarded a multi-million dollar contract by Wisconsin Public Service (WPS) to upgrade the control system on its Weston Unit 3 Power Plant.

[Read the rest of this article...]

Posted in: Surface Finishing
Actions: E-mail | Permalink |
Page 9 of 10First   Previous   4  5  6  7  8  [9]  10  Next   Last